“After 6 months with EULE I earned my certification and got my first job within a few weeks. The mentor was essential.”
Eleonora
EULE Institute student
EULE Institute Network
Move between the EULE Institute sites.
From theory to practice all the way to your portfolio: 10 modules to manage real projects with Waterfall, Agile and Scrum methodologies. 200 hours of training and the PMEI® credential.
From defining the scope to closing, with a method applicable to any sector.
Choose and apply the right methodology based on the project context.
Break the project into tasks, plan resources and milestones.
Team leadership, cost estimation, financial control and contingency plans.
Asana, Trello, Monday.com and Jira to organize projects and teams.
200 hours of certified training you can use in the job market.
Il Project Manager pianifica, coordina e porta a termine progetti in tempo e budget. Una figura richiesta in IT, ingegneria, consulenza, edilizia e sanità.
Junior · 0–2 years
€35–45k
Mid · 2–5 years
€45–60k
Senior · 5+ years
€60–80k
Source: Crebs Salary Guide 2026 (~3,000 professionals surveyed) and Glassdoor Italy 2026 averages. Figures are indicative and vary by company size, location and benefits.
The program
7 chapters · 116 lessons · 200 hours
3 lessons
3 lessons
3 lessons
4 lessons
4 lessons
4 lessons
4 lessons
I nostri studenti applicano il metodo su casi concreti. Ecco una selezione dei project work completati durante il percorso.
A method built to help you truly learn and arrive job-ready.
An industry professional guides you step by step, with unlimited calls and feedback on your projects.
At the end of the path you earn a recognized certification to add to your CV and LinkedIn profile.
Study where and when you want, from your device, with video lessons and materials always available.
Once enrolled, the content is yours forever, including future updates.
Learn by doing: practical exercises and concrete projects to build a portfolio that makes a difference.
We help you enter the job market with advice on CV, portfolio and interviews.
Professionals like you who changed careers thanks to EULE Institute.
“After 6 months with EULE I earned my certification and got my first job within a few weeks. The mentor was essential.”
Eleonora
EULE Institute student
“Clear lessons, materials always available and constant support. I could study at my own pace without stress.”
Irene
EULE Institute student
“The hands-on part really makes the difference: I built a real portfolio that opened the doors to the industry.”
Arianna
EULE Institute student
“With a full-time job I thought it was impossible. With EULE I studied in the evenings and on weekends and earned the certificate.”
Filippo
EULE Institute student
4 concrete guarantees, no fine print
If you're not satisfied within the first 2 weeks, we refund everything, no questions asked.
Most of our students start from scratch. The modules are progressive, from beginner to advanced.
No expiration. Study at your own pace and rewatch lessons whenever you want, at no extra cost.
1:1 calls with human mentors who are industry experts. This is not a pre-recorded course: it's a guided path.
After enrolling you get immediate access to all content and can book your first call with your mentor right away.

No. The path starts from the basics and is designed also for those switching careers or who have never managed projects.
It's the credential issued by EULE Institute on completion of the 200 hours of training, which you can use in the job market.
You study Waterfall, Iterative, Agile and Scrum, and learn to use Asana, Trello, Monday.com and Jira.
Yes: the free trial gives you access to the first 9 lessons so you can evaluate the method before enrolling.
A dedicated mentor supports you throughout the entire path, with feedback on your projects and ongoing support.
Access is lifetime: you study at your own pace, whenever and wherever you want.
Immediate access to all content, a personal mentor and a final certification. Start today.
€947
Project Management Course
€947